Dedicated system integration solution
Quick facts:
- 70 x32 metre (4 levels)
- Column pitch according to concrete pillars in the floor slab 5.4 x 5 metre
- Up to 12,200 mm height
- >10,000 m2 surface
The challenge:
Create more space for this business with a four-tier mezzanine floor without interrupting the work. The steel construction had to support a hanging material handling system and had to secure a free running system.
Our solution:
A new mezzanine floor with a special stability design to give the customer a 100% free access and clear space with no blocking cross braces. Installation by our installation professionals with no effective hinder for the customer, so they could continue their business undisturbed.